V1 Cadeias Energia Br

api.brazilayer.com · General

Causal chain for Brazilian power risk: forecast rainfall over the Southeast/South (leads reservoir levels by ~2-4 weeks) → stored hydro energy per subsystem and its 7-day slope, from the grid operator → likelihood of thermal dispatch and cost pressure. Brazil runs on hydro: this is the upstream of industrial energy cost, and the rule and its limits travel in the response. Free sample, no payment: https://api.brazilayer.com/v1/cadeias/amostra

  • payment-native
  • x402-exact
Verified

Price and execution

Price
$0.05 USD credits / call
Trust tier
Verified
Execution
Managed call
Capability group
General

Interface snapshot

Protocol
HTTP operation
Operation
GET /v1/cadeias/energia_br
Interface artifact
sha256:9860e529ab976074ef2c3d88112966b382d5c869b6f618daf28490e252bf6c73
Manifest digest
sha256:8b04ec0b16ad87cde80e06b02069be7d924d2706bae00534d4398467a72f46a1

Similar offerings

Capability / providerTierPriceProtocolCapability groupInspect

Feedback

x402.ottoai.services

Tier: Verified. Protocol: http. Group: General.
Verified$0.001 / callhttpGeneral

V1 Ping

x402.lucidcove.org

Tier: Verified. Protocol: http. Group: General.
Verified$0.001 / callhttpGeneral

V1 Ping

x402-factory.com

Tier: Verified. Protocol: http. Group: General.
Verified$0.001 / callhttpGeneral